Wayland wastewater commission expands sewer capacity by 10,000 gallons

WAYLAND — November 16, 2022 — Wayland sewer commission unanimously frees 10,000 gallons of capacity for new commercial hookups. The Wastewater Management District Commission voted 3-0 on Nov. 16 to raise allocated Title 5 design flow to roughly 124,000 gallons per day, with two property owners already lined up to close in December, according to Wastewater Administrator Sarah Pawluczonek. Chair Michael Gitten, joined by Doug Levine and Darrin Bock, paired the move with a planned "privilege fee" of about $22.03 per gallon projected to raise $220,000 over three years for small capital work. DPW Director Thomas Holder said the plant, now permitted for 89,000 gallons after Alta River's Edge added a leaching field, would operate "much more content doing 70" — likening it to his Kawasaki Vulcan. Operations Manager Pez resigned effective Dec. 2.

Keep reading with a 14-day free trial

Subscribe to Wayland MA News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Wayland MA News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Westford Post · The Weston Post · The Wilmington Post · The Winchester Post · The Woburn Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.