Wayland Board of Health backs reduced wastewater design at high school

WAYLAND — March 24, 2025 — Wayland Board of Health backs 8,000-gallon wastewater design at high school, opening door to a passive system. The board voted 4-0 March 24 to support Town Engineer Abby Cutting's request for a state variance reducing the high school's design flow from 12,000 to 8,000 gallons per day, after a Pine Bond report pegged reactivation of the dormant treatment plant at roughly $5.5 million plus $3.6 million in 20-year O&M costs. Cutting said actual school-year flows averaged 1,400 to 1,700 gallons per day and that a more "passive system" would better handle seasonal swings in the Zone 2 wellhead area. The board also voted to require weekend lifeguards at the Oxbow apartment pool, citing 94 to 96 percent occupancy and more than 30 resident minors, and accepted a passing Title 5 inspection at 22 Forest Hill Road over a competing failed report from Wind River Environmental.

Keep reading with a 14-day free trial

Subscribe to Wayland MA News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Wayland MA News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Westford Post · The Weston Post · The Wilmington Post · The Winchester Post · The Woburn Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.