Wayland water board seeks $1.23M design vote at April 7 town meeting

WAYLAND — March 25, 2025 — Wayland's Public Works board makes final pitch for $1.23 million water design vote before April 7 town meeting. At a hybrid forum Tuesday, DPW Director Tom Holder told residents the dual-source plan — keeping the Happy Hollow wellfield and adding an MWRA connection through Shaft L in Framingham — would cost $35 million to construct versus $22 million for full MWRA service, but is cheaper over 25 years and is the only path that satisfies the state's Interbasin Transfer Act. Holder warned a failed vote would imperil a $7 million MWRA entrance fee waiver expiring in December 2027 and the April 2029 federal PFAS limit of four parts per trillion. Former board member Bob Goldsmith pushed an alternative Veolia resin system, saying "I don't think there's a chance in hell of meeting 2029" under the current carbon design. About 1,200 of 5,000-plus accounts now have new AMI meters, and the board approved Feb. 12 minutes.

Keep reading with a 14-day free trial

Subscribe to Wayland MA News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Wayland MA News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Westford Post · The Weston Post · The Wilmington Post · The Winchester Post · The Woburn Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.