Sign in Subscribe

Landfill committee approves $9,900 contract with Boston design firm

WAYLAND -- December 19, 2023, Wayland's landfill visioning panel hires Boston firm for $9,900 to draft reuse concepts. The Route 20 South Landfill Visioning Committee voted 5-0 on Dec. 19 to engage The Collaborative, authorizing Chair Thomas Fay, member Clifford Lewis and DPW Director Tom Holder to tighten the scope before signing. Funds come from roughly $120,000 left of a $150,000 engineering appropriation; Holder said the price "is coincidental" in falling just under the town's $10,000 procurement threshold. Principal Bill Giesentanner told the panel the capped site "could be a wonderful conservation asset or it could be developed commercially." Member Erin Gibbons pressed to skip a planned one-day workshop because the committee has already generated about 17 candidate uses over 15 months. Holder also reported a favorable MEPA opinion and said DPW will perform Phase 1 tree clearing in-house.

Keep reading with a 14-day free trial

Subscribe to Wayland News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Wayland News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe