Wayland design board defers Coptic church review, citing thin detail

WAYLAND — September 9, 2025 — Wayland design board continues Coptic church review, says plans lack required detail. The Design Review Advisory Board voted unanimously Tuesday to reschedule its hearing on Saint Mercurius and Saint Mina Coptic Orthodox Church, a three-building, 5.5-acre complex proposed off Rice Road, until DSK Architects returns with information on lighting, materials, buffer zones and landscaping. Architect Shaun Landon said the church would be built first, with construction starting in 2027 and lasting about 18 months; a recreation building would follow in three to five years and a diocesan building in 10 to 15. Chair William Sterling urged the applicant to pursue net-zero energy, saying a traditional building done that way "would make the magazines." Member Robin Borgestedt said the plans show "an awful lot of pavement," and member Tatiana Person asked for redistributed parking and a 3D view. Neighbors objected to the removal of roughly 450 mature trees and to a church proposed at about 90 feet tall on a 30-foot grade. The Planning Board takes up the application Oct. 15.

Keep reading with a 14-day free trial

Subscribe to Wayland MA News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Wayland MA News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Westford Post · The Weston Post · The Wilmington Post · The Winchester Post · The Woburn Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.