Wayland board reviews $17M to $29M water supply options as PFAS plant stays offline

WAYLAND — October 3, 2022 — Wayland weighs $17M-$29M water options as PFAS plant remains offline. The Board of Public Works on Oct. 3 reviewed five scenarios from consultant Kleinfelder, ranging from a $28.8 million local-only path requiring PFAS treatment at Baldwin Pond, Chamberlain and Happy Hollow, to a $17 million MWRA transmission main routed along the Hultman Aqueduct corridor. Project Manager Kirsten Ryan said EPA is expected to issue a near-zero enforceable PFAS limit as soon as December, meaning treatment "to non-detectable" at every source. The Happy Hollow plant remains inactive over disinfection problems and a failed gasket; August results showed 18 parts per trillion. Staff confirmed the MWRA board voted Sept. 14 to waive its entrance fee for five years, and a separate emergency Main Street connection is targeted for June 1, 2023.

Keep reading with a 14-day free trial

Subscribe to Wayland MA News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Wayland MA News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Westford Post · The Weston Post · The Wilmington Post · The Winchester Post · The Woburn Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.