Wayland Planning Board sets Nov. 12 ADU forum, authorizes Rice Road peer review

WAYLAND — August 27, 2025 — Wayland's sewer system has roughly 10,000 gallons per day left to sell, complicating Route 20 redevelopment. Wastewater Management District Commission Chair Mike Gittin told the Planning Board on Wednesday that customers have already subscribed 119,809 gallons of the 130,000-gallon Title 5 design flow the commission is willing to allocate, at a privilege fee of $24.75 per gallon. The plant is permitted to discharge a combined 89,380 gallons per day, but the commission has capped working capacity at 65,000 gallons until the 2014-rebuilt facility proves it can sustain higher loads; June averaged a record 34,000 gallons per day. Chair Anette S. Lewis and Housing Partnership representatives Kathleen Vallee and Rachel Black also targeted Nov. 12 for a town-wide accessory dwelling unit forum, with new 900-square-foot units estimated at $350,000 to $450,000. The board voted 3-0 to approve its FY2025 annual report and 3-0 to authorize peer review of a 169 Rice Road site plan for the Egyptian Coptic Church.

Keep reading with a 14-day free trial

Subscribe to Wayland MA News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Wayland MA News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Westford Post · The Weston Post · The Wilmington Post · The Winchester Post · The Woburn Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.