Wayland Conservation Commission delays St. Ann's housing vote for peer review

WAYLAND — February 7, 2024 — Wayland Conservation Commission delays St. Ann's 60-unit affordable housing vote until March 20. Engineer Steve Garwin told commissioners the Archdiocese of Boston Planning Office for Urban Affairs project at 124 Cochituate Road has moved its detention basin and pulled the septic system outside the 100-foot buffer, but Administrator Linda Hansen is still collecting peer-review bids from Tetra Tech, BSC Group and Meridian on stormwater and groundwater mounding. Vice Chair Luke Legere said the peer reviewer is "the logical next step." The commission also let new owners of 102 Boston Post Road avoid a return hearing after admitting unpermitted removal of trees on a lot Hansen said had gone "pretty much barren," and conditioned a 1,500-square-foot rain garden at 5 Edgewood Road on replacing daylilies that member Shannon Fischer called "increasingly recognized as invasive."

Keep reading with a 14-day free trial

Subscribe to Wayland MA News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Wayland MA News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Westford Post · The Weston Post · The Wilmington Post · The Winchester Post · The Woburn Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.