Wayland DPW board blocks contaminated soil transfer to South Landfill

WAYLAND — October 18, 2022 — Wayland DPW board blocks contaminated soil transfer pending its own review. The Board of Public Works on Tuesday unanimously passed a motion by member Mike Wegebauer barring any new material from being placed at the Route 20 South Landfill or other board-controlled property without express written approval, after hearing rumors that PFAS-contaminated soil from the Loker Field project might be stockpiled there. Town Manager Stephen Crane, joining late, called the action premature and warned it could cost taxpayers "hundreds and hundreds of thousands of dollars" to truck the material to Ohio, accusing the board of asserting control "without even any kind of analysis." Chair Cliff Lewis cited the 195 Main Street precedent, where materials were placed without notice. Separately, DPW Director Tom Holder reported the Happy Hollow PFAS treatment system was activated Friday and is producing roughly 545 gallons per minute on two of three wells; converting the site's plastic piping to welded steel would cost about $300,000.

Keep reading with a 14-day free trial

Subscribe to Wayland MA News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Wayland MA News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Westford Post · The Weston Post · The Wilmington Post · The Winchester Post · The Woburn Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.