Wayland Conservation Commission issues enforcement order for unpermitted wetlands excavation

WAYLAND — November 9, 2022 — Wayland Conservation Commission ratifies enforcement order over unpermitted wetlands work at 28 Marshall Terrace. Conservation Administrator Linda Hansen told the board she found a newly built sports court within five feet of a stream, a large excavated hole and a hired excavator operating inside the wetland after neighbors flagged the work; she bypassed a violation notice and went "straight to an enforcement order." The 6-0 vote came in a marathon Nov. 9 meeting that also continued a notice of intent from Dr. Miguel Ortiz to rebuild a three-story dental office at 233 Boston Post Road — where five proposed employee parking spaces sit inside the 30-foot no-disturbance buffer — and continued a 3,150-square-foot single-family rebuild at 135 Old Connecticut Path for owner Ulysses Hernandez. Chair Sean Fair pressed for the excavation contractor's name, calling the contractor responsible for "a big share of the fault." The board also accepted the deed for 27 Sherman Bridge Road ahead of a Nov. 22 closing.

Keep reading with a 14-day free trial

Subscribe to Wayland MA News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Wayland MA News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Westford Post · The Weston Post · The Wilmington Post · The Winchester Post · The Woburn Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.